klarety_ai

Layers

klarety_ai

Save this map to unlock all layers

Create a free account to explore, toggle, and interact with every layer in this analysis.

klarety_ai

Conversation

Analyze terrain stability for new 2026 access roads leading to @pilbara_iron_mine
7 months ago

script.py

ubuntu@sandbox:~$python script.py
Report saved: executive_summary.mdWord count: 6032 

Terrain Stability Analysis for 2026 Access Roads: Pilbara Iron Mine, Western Australia

Key Events

10 insights

1.
2.
3.

Key Metrics

Terrain Suitability92.7% of 34,208 km² study area suitable for road construction
Stable Terrain Coverage72.9% (24,959 km²) has slopes <5° requiring minimal grading
Mean Terrain Slope4.48° across region, well within road engineering thresholds
Median Slope2.09° - half of area essentially flat

Vector Files

1 vector available

Pilbara Iron Mine Study Area Boundary

Vector Dataset

Gallery

5 images

Cumulative Slope Distribution Curve

Elevation Distribution Profile

Slope Stability Classification Pie Chart

Comprehensive Terrain Analysis Dashboard

Terrain Statistics Summary Chart

Satellite Images

12 satellite imagess available

Digital Elevation Model - Pilbara Iron Mine Region

Terrain Slope Gradient Map

Slope Stability Classification for Road Construction

Terrain Aspect (Slope Orientation)

Hillshade Relief Visualization

NDVI Vegetation Density Map

Sentinel-1 SAR Backscatter (Soil Moisture Proxy)

Sentinel-2 True Color Composite

Drainage Network Flow Accumulation

Integrated Terrain Risk Assessment Matrix

Overall Road Suitability Assessment

Combined Vegetation and SAR Analysis

Files

16 files available

Python· 6

JSON· 2

Klarety